|
| |
|
| The list of the utilities is available as given below |
| |
Equipment Name |
Capacity |
Hot oil system |
400000Kcal/hr |
Boiler |
3 TON |
Brine compressor |
40TR + 20TR |
Air compressor |
560 lts/min (2No’s) |
Softener |
50 m³/ refrigeration |
Cooling tower |
400 TR + 250TR |
Diesel generator |
200 KVA (2No’s) |
Transformer |
750 KVA |
RO plant |
2.5 m³/hr |
DM plant |
2.5 m³/hr |
|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
 |
|
|